R&D for GRK "Bystrinskoye", Bystrinsky GOK

  • Realization period
    2025
  • Process
    НИОКР для последующей поставки промышленных флотомашин СФ
  • Customer
    GRK "Bystrinskoye"
  • Manufacturer
    Alliance Technology LLC
  • Area of activity
    Mining Department
  • Research and development activities

During the project execution:

  • In th factory conditions, a set of pilot tests was carried out at the pilot plant SF C500/1, including tests to determine the effective parameters of the flotation machine, control tests with the development of final flotation productsfor quantitative chemical analysis.
  • Calculations of the qualitative-quantitative and water-slurry circuit shemes;
  • Calculatios and selection of industrial flotation machines for the operating and designed enrichment plant Bystra-2, providing the necessary technologial indicators of the flotation.