R&D for GRK "Bystrinskoye", Bystrinsky GOK
-
Realization period2025
-
ProcessНИОКР для последующей поставки промышленных флотомашин СФ
-
CustomerGRK "Bystrinskoye"
-
ManufacturerAlliance Technology LLC
-
Area of activityMining Department
-
Research and development activities
During the project execution:
- In th factory conditions, a set of pilot tests was carried out at the pilot plant SF C500/1, including tests to determine the effective parameters of the flotation machine, control tests with the development of final flotation productsfor quantitative chemical analysis.
- Calculations of the qualitative-quantitative and water-slurry circuit shemes;
- Calculatios and selection of industrial flotation machines for the operating and designed enrichment plant Bystra-2, providing the necessary technologial indicators of the flotation.