R&D for Vysochaishy JSC (GV GOLD), GOK Vysochaishy, ZIF-3

  • Realization period
    2024-2025
  • Process
    НИОКР для последующей поставки промышленных флотомашин
  • Customer
    Vysochaishy JSC
  • Manufacturer
    Alliance Technology LLC
  • Area of activity
    Mining Department
  • Research and development activities

During the project execution:

  • In the laboratory conditions, a complex of enlarged tests at the pilot installation L150 was carried out, including tests to determine the effective parameters of the flotation machine operation;
  • Development of the flotation scheme and reagent mode for ZIF-3 tailings;
  • Control tests with the development of final flotation products for qualitative chemical analysis;
  • Calculations of the qualitative-quantitative and water-slurry circuit scheme;
  • Calculations and selection of the industial flotation machines for additional enrichment of tailings ZIF-3 were performed providing the necessary technological indicators of flotation.